The National Plan was under preparation for a long time. The first working version was
presented to the professional public back on 30 September 2014. Public consultation was
held at the turn of 2014 and 2015. Two interdepartmental comments procedures followed in
the summer and at the end of 2015. This long preparatory period, however, contributed to
ensuring that the issue in question was gradually comprehensively, openly discussed and
debated by all the relevant and concerned entities.
In the first quarter of 2016, the Czech Telecommunication Office initiated, through an
electronic data collection system, the acquisition of geographic data on selected parts of the
network infrastructure from entities operating on the electronic communications market. The
entities concerned provided, inter alia, data mapping the existence of network infrastructure
enabling the provision of services determined through parameters, including investment
plans for a three year period, in accordance with the objectives of the Digital Czech Republic
strategic document, i.e. connections through which it is possible to provide an Internet
access service with speeds in categories up to 30 Mbit/s, from 30 to 100 Mbit/s, and above
100 Mbit/s. In a geographic breakdown to address point, data were also collected about the
currently provided Internet access service in the given address point through this
infrastructure.
In the second quarter of 2016, in cooperation with the Platform of the Professional Public for
the Development of Broadband Internet Networks organised by the Czech Chamber of
Commerce and the Confederation of Industry of the Czech Republic, four working groups
were established focusing on discussing certain important parts of the National Plan for the
Development of Next Generation Networks, and particularly on the subsidy policy, nonsubsidy support, i.e. on legislative and regulatory aspects, the wholesale offer and the
definition of next generation access networks and the related technical parameters. The
outputs from these working groups were incorporated into the National Plan to a reasonable
extent. These working groups included over 40 experts from the commercial sector, the
Ministry of Industry and Trade and the Czech Telecommunication Office.
The National Plan for the Development of Next Generation Networks is effective from the
date of its adoption by the Government of the Czech Republic in 2016. Due to the timeframe
of its implementation as stipulated in chapter 10.2, the validity of this document is expected
to end in 2023.
8