3.1.2 BACKBONE INFRASTRUCTURE
Although some operators have built their own microwave and fibre backbone
links in some areas, Somalia does not have an open competitive market in
national and international capacity - a necessary precursor to the development
of the ICT sector. As a result, growth in Internet-use is also constrained by both
the high cost of international bandwidth and the lack of a domestic fiber optic
backbone infrastructure outside of Mogadishu to link the landing stations to
the other cities and towns across the country.
Once a pervasive national fibre backbone is in place, Somalia’s strategic
geographic location and multiple international cable links can be leveraged
to the benefit of the domestic ICT industry and the public. Somalia is close
to several major undersea cable networks which connect Europe, the Middle
East, India and the Gulf of Aden. To maximise this potential an open stance
will be taken on licensing cable landing stations, and competitive international
gateways will be encouraged.
International connectivity in Somalia has already improved in recent years
with the landing of the EASSy submarine cable in Mogadishu and Somcable’s
terrestrial fiber link to Djibouti, which takes advantage of the large number of
submarine cables there to obtain low cost international capacity. In addition,
the cable landing in Bosasso from Oman is used by Golis Telecom and
terrestrial fiber networks from Kenya and Ethiopia have been extended to the
Somali border.
In the future, the Djibouti Africa Regional Express (DARE) cable initiative will
connect Djibouti, with Berbera, Bosaso, Mogadishu and Mocha (Yemen). In
addition, the PEACE and AfricaOne cables and other international submarine
fiber optic cables running along the East Coast, are also expected to become
present in the Somali market, such as SEACOM, and TEAMs.
Deployment of domestic fibre infrastructure to connect the urban areas is
a top priority, necessary to ensure inclusion of the whole country in access
to affordable Internet services. Wherever feasible, the national backbone
network will prioritize deployment of fiber optic cable, due to its superior
network capacity - meeting the expected demand in large urban locations
will be economically infeasible using non-fiber solutions such as satellite
or microwave radio links. Nevertheless, in the interim before terrestrial
infrastructure becomes available, and for remote rural areas as well as for TV
broadcasting and backup links, traditional satellite connectivity will continue
to play an important role. In the future, new high altitude platforms (HAPs)
and constellations of low earth orbit satellites (LEOs) may disrupt the existing
market with new low cost broadband services.
Initial estimates indicate that the envisaged fibre optic backbone network
would cost between US$67-100 million to build. Combining network
deployment with planned road reconstruction would provide substantial cost
savings on this estimate, while reaching additional smaller cities and rural
areas, as well as improving network resilience, in subsequent phases, will
require additional investment.
12
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents