Planning and conducting
4.2. The planning and conduct of CEMA needs to be considered within
strategic- and operational-level planning frameworks at a joint level. During
the options development process, liaison and coordination between
planning staff responsible for CEMA is paramount. This coordination will
assess how these capabilities can be best used against the developing
options or courses of action within legal boundaries or other restrictions.
Force generation activities involving CEMA planning staffs are used to advise
the commander on the CEMA component of the Whole Force, especially
where deployed personnel numbers are fixed and where CEMA may be
conducted with reachback to non-deployed CEMA specialists.
Section 2 – Synchronising and coordinating
4
4.3. The synchronisation and coordination of CEMA within a joint force
headquarters (JFHQ) can be conducted by the electromagnetic battlestaff
(EMB) with cyber representation. The EMB structure uses and builds on the
existing Electronic Warfare Coordination Cell (EWCC).44 It is the role of the
EMB to coordinate and monitor all aspects of electromagnetic activities
within the electromagnetic environment on behalf of the Joint Forces
Command (JFC) directorate staff.45
4.4. Joint Concept Note (JCN) 1/17, Future Force Concept, states that
‘Influence will only be achieved with a clear focus on audiences and effects,
and by integrating and synchronising kinetic and non-kinetic activities
conducted across the physical and virtual domains to try to achieve those
44 The Electronic Warfare Coordination Cell (EWCC) may comprise a liaison officer with
reachback to supporting national bodies, or a staff of between three to as many as 12
or more, as necessary for a specific operation. Training is an essential element to EWCC
where there is a need for highly skilled staff to carry out its activities. It is fundamental
that in undertaking CEMA, extant functions such as EWCC are included. See Allied Joint
Publication (AJP)-3.6, Allied Joint Doctrine for Electronic Warfare, Edition B, paragraphs 0205
and 0207 for more details.
45 Allied Joint Publication (AJP)-3.6 explains that electromagnetic battlestaff (EMB)
would include members from the Joint Forces Headquarters (JFHQ) J3 (Operations), J5
(Planning), J2 (Knowledge) and J6 (Communications and information support) staff. The
director of the EMB will be designated by J3. Note AJP-3.6, Edition C, was being drafted at
the time of publishing.
42
JDN 1/18