MyMIS
Best practice: Use for critical system.
vi. ICT System Performance Monitoring
Analysis.
This programme analyses system
performance in real time to look for items
such as abnormal system response time
or abnormal request for resources.
Best practice: Run constantly at the background.
Consider adequate lead-time for remedial action.
Improving operational
assurance addresses
technical issues.
2.6
Operational Assurance Issues
Several issues are addressed and recommended to improve the operational
assurance.
(a) Encouragement in the Usage of Locally Developed Security Products
Locally developed security products are preferred over foreign makes
to help spur local ICT security development.
(b) Network Auditing
Network auditing methods and tools should be use to ensure the security
of the network and to simplify the management of network auditing.
Examples of automated auditing methods are the checking and verifying
of the data packet from one terminal to the other.
(c) Analysis of the ICT System Activity Log
The ICT system produces the ICT system log. This could be a daily,
weekly, monthly or other time-based activity log. It is a detailed log
that indicates the user’s activity. The log should be checked and reviewed
by the ICTSO or by internal or external auditors.
(d) Maintenance Contract
Maintenance clauses should be incorporated into Sales and Purchase
Agreement to include provisions for hardware maintenance by the
supplier during the warranty period. In some cases it may be necessary
to stipulate the service level required.
(e) Standard Operating Procedures
Standard Operating Procedures should be documented and formalised.