MyMIS
4th stage: Operation/Maintenance - This is the stage where the developed
system runs alongside the daily operations of the department. As the system
matures, expansion through additional equipment and application systems
is inevitable. New requirements may become apparent and obsolete functions
may need to be removed.
5th stage: ICT Security Assessment - This is the stage where an assessment
is made to determine whether ICT Security requirements are met.
At each of the five (5) stages, additions or deletions to the existing system
may take place. Therefore the security aspects must be considered for each
activity in every stage.
2.5
2 rule of thumb
questions.
Public Sector ICT Security Assurance
The Public Sector ICT Security assurance means the confidence level in the
Public Sector ICT Security safeguards to operate correctly as planned. The
effectiveness of ICT security is not easy to assure because of the difficulty
in quantifying assurance. As a rule of thumb, two (2) questions should be
asked:
(a) who needs to be assured; and
(b) what type of assurance is required.
There are many methods and tools available. Two (2) of these are described
below: Design and Implementation Assurance; and Operational Assurance.
2.5.1
Design and Implementation Assurance
The design and implementation assurance means that the design features
of the ICT system, its operations or ICT assets must meet requirements and
specifications. Assurances of this nature require the examination of the ICT
system design, the correct functioning of each application and the manual
processes that support it. Design and implementation assurance is associated
with the development, testing, as well as pre- and post-implementation stages
of the ICT system life cycle. The design and implementation assurance seeks
to address whether the end product complies with the agreed Public Sector
ICT Security specifications. It is also used to provide evidence of deviation
and remedial action.
The following sub-sections suggest some of the major methods that can be
adhered to in achieving design and implementation assurance.
2.5.1.1
Testing to ensure
compliance to
requirement and quality.
Copyright MAMPU
Testing and Certification
Testing is an activity to quantify compliance to stated requirements. In addition,
it can be used to address the quality of the ICT system as it is being
built, implemented and operated. Therefore, the testing should be
performed throughout the development cycle or wherever proof of compliance
is required.
Chapter 2 - 11
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents