b) A lack of coordination of the structures of different investors in a given locality (the
issue of so-called “overlaying”, technical standards, the need to change or renew a
land use decision, protection and safety zones).
c) Unresolved possibility for sharing passive infrastructure suitable for establishing
electronic communications networks (lack of awareness about the existence of usable
passive infrastructure, the absence of conditions for its sharing, etc.).
d) Unreasonable requirements for the subsequent treatment of surfaces of the land in
question over and above what is essential (the original or an appropriate state).
e) Disproportionate deadlines for the occupancy proceedings for
communications networks structures (this also applies for other utilities).
electronic
f) The placement of internal communications lines and the conditions for their potential
sharing are not adequately addressed in the applicable legislation and technical
standards.
g) The complexity and slowness of the process for expropriating property rights
necessary for the placement of electronic communications networks (in particular the
demonstration of public interest, the unique nature of the technical solution, the scope
of documents required).
4.3.2 Financial barriers
a) The one-time compensation for the establishment of easements is not demanded as
standard by property owners according to a unified methodology. In particular, the
demands of government authorities, local government and enterprises with state or
local government ownership often exceed the market value of the property. In
addition to one-off financial compensation unreasonable requirements are often
exercised in the form of non-monetary performances, e.g. returning the surfaces of
the land in question beyond the framework of restoration to their original (or a
corresponding) state.
b) The amounts of fees demanded for the use of open public space does not correspond
to the level of temporary aggravation of the use of the open space in question for the
needs of electronic communications networks in the public interest.
c) The legislation regarding responsibility for municipal management does not
adequately enable municipalities to require a one-time compensation for the
establishment of an easement for a lower price.
d) The long periods for the tax depreciation of constructed networks reduces possibilities
for private investment.
4.4 Investment models for support and business models for the development
of NGAs
4.4.1 Investment models and the selected investment model for the development of
NGAs
The selection of the most appropriate investment model is crucial for the fulfilment of the
determined objectives; its determination was based on the material Guide to High-speed