CONTENTS 1. Introduction 3 2. Priority Measures 5 3. 2.1. The use of newly established or significantly renovated line structures for the development of electronic communications networks......................................................... 5 2.2. A substantial reduction of payments for establishing easements for the placement of public communications networks on land lots of state and regional authorities ................. 8 Identification of additional obstacles for the development of electronic communications networks and proposals for solution 10 3.1. Information regarding additional infrastructure that can be used for sharing ................... 10 3.2. Establishment of regional databases of investment plans regarding line structures in urban and non-urban areas within the meaning of Act No. 194/2017 Coll................................... 12 3.3. Sharing of internal communications lines in residential buildings with multiple apartments ............................................................................................................................................. 13 3.4. Placement of elements of electronic communications on unsurfaced areas alongside roads ............................................................................................................................................. 15 3.5. Option to establish easements for the existing public communications networks under a court decision ...................................................................................................................... 17 3.6. Allowing access to mobile networks on railway and other transport lines and inside rolling stock l .................................................................................................................................. 18 3.7. Adjustment of fees for the use of radio frequencies in the mobile and fixed service ........ 20 3.8. Extension of conditions for the use of microwave frequencies .......................................... 22 3.9. Coordination of the development of high-speed internet access ....................................... 23 3.10. Preparation of technical professions for the field of electronic communication networks 25 3.11. Overhead communication lines .......................................................................................... 27 3.12. Obligation by the property owner to allow the user to connect to the public communication network ..................................................................................................... 28 3.13. Preparation of houses for high-speed infrastructure .......................................................... 29 2

Select target paragraph3