Why
a
PPP
might
be
created
Public
Sector
led
reasons
There
is
a
na3onal
strategy
but
there
is
a
limited
means
to
deliver
it
so
a
PPP
is
needed
to
provide
this
mechanism.
The
need
for
a
mechanism
to
get
industry
to
help
respond
to
a
crisis.
Na3onal
security
strategy
requires
a
capability
to
share
with
industry
representa3ves.
The
government
has
a
responsibility
to
protect
the
Cri3cal
Infrastructure
and
does
not
have
a
mechanism
to
involve
industry.
There
is
not
enough
money
for
the
public
sector
to
engage
all
small
stakeholders
in
a
Cri3cal
Infrastructure
crisis
Page
§
30