37
* grids;
* the mapping of the current electronic communications network infrastructure.
Additionally, the detailed description of the actions required in these areas is included in NextGeneration Broadband Electronic Communications Network Development Concept for 2013202033.
5.2.1 Transport Networks
Transport network is the part of the electronic communication network with a high throughput,
which is designed to provide data transmission between the grid and the “last mile” (subscriber
line). One of the problems identified in the research34 conducted by the Ministry of Transport is
the lack of high-quality high-speed transport network.
Electronic communications networks in Latvia have not been built in sufficient amount, as well
as existing networks often are not capable to provide the necessary amount of data throughput.
Without the developed transport network infrastructure, it will be impossible to transfer the
information volume generated by the next-generation networks. Also, an opposite connection
exists – electronic communications merchants will not be interested in the development of the
next-generation access network subscriber lines, if there will not be an appropriate transport
network infrastructure.35
In order to address the problems identified in relation to electronic communications transport
network, the Ministry of Transport and the EC in 2011 agreed on Optical Network National
Assistance Programme (NAP) (November 9, 2011 EC Decision No. C(2011)7699; the EC State
aid case number – SA.33324(2011/N)), which provides building of fibre optic electronic
communications network and creation of optical access points in municipalities that do not have
optical network connection and where none of the merchants intend to create such in immediate
future. In order to fully realise the NAP, the total amount of state aid that is required for the
development of the optical transport network within the Optical network NAP is 71.5 million
LVL.
JSC “Latvian State Radio and Television Centre” has been determined as the developer of
Optical Network NAP, and is required to provide open access to established infrastructure and in
order to avoid possible competition distortions, restrictions in accordance with the NAP and the
EC decision have been defined.
Implementation of Optical Network NAP is envisaged in two stages. Phase 1 of Optical Network
NAP has been launched and Cabinet Regulation No. 79 “Regulation on operational programme
“Infrastructure and Services” adopted on 24 January 2012, amendment point’s 3.2.2.3 activity
“Provision of Equal Availability of Electronic Communications Services Throughout the Country
33
Cabinet Order No. 589 “Next-Generation Broadband Electronic Communications Network Development Concept
for 2013-2020” adopted 7 December 2013
34
Consultation material on the infrastructure development project of electronic communication optical transport
network (“middle mile”) http://www.sam.gov.lv/satmin/content/?cat=451&art_id=2384
35
Next-Generation Broadband Electronic Communications Network Development Concept for 2013-2020 (Cabinet
Order No. 589 “Next-Generation Broadband Electronic Communications Network Development Concept for 20132020” adopted 7 December 2013)
information_society_development_guidelines_2014_2020.docx; Information Society Development Guidelines
2014-2020