Image No 2 Map of the coverage of the Czech Republic with electronic communications networks for Internet access services as of 25 May 2016 (current state without taking into account planned investments), CTO In relation to the facts stated above, it is necessary to note that mapping of address point coverage can be methodologically biased by the fact that any building with a street number and a registration number, i.e. including buildings not intended for living. The mapping process outlined in the first step and the colouring of individual BSUs are thus to be seen as indicative only, also reflecting the fact that the protection of investments applies to current and planned NGA networks regardless of whether the available NGA connection is situated in a place intended for living or not. To identify the intervention areas, the places with addresses located in white BSUs will be adjusted, if necessary, based on the publicly available and relevant information, so that such places that are not covered under the OP EIC objectives are excluded. 4.1.2 Public consultation A key aspect of the provision of public aid through specific objective 4.1 of the OP EIC is a verification of the mapping results in public consultation, the objective of which is to reduce to a minimum any disruption of competition with existing providers and with entities that have prepared investment plans for the following three-year period, and to fix the “white”, “grey” and “black” areas obtained as a result of the mapping. The mapping results that will be associated with the following determination of areas of intervention and the call within the framework of the OP EIC, will be publicly available on the website of the MIT as well as through a link from the website of the CTO. Each entity will be able to comment on the colour of the given area through a collective, or if necessary, individualised public consultation. The collective public consultation on the areas of intervention will take place always before each individual call of specific objective 4.1 of the OP EIC. Such public consultation will include a definition of the areas of intervention that will be proposed by the OP EIC Managing Authority. The proposal for the areas of intervention will be based on the output of the consultation concerning NGA mapping. 22

Select target paragraph3

Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents